ArcelorMittal Kryvyi Rih

ArcelorMittal to build new gas control stations at blast furnace №9 and CHPP-3

The company plans to ensure uninterrupted gas supply to consumers and energy efficiency in the gas distribution system

ArcelorMittal installed a plasma cutting machine in the steel structure shop

The unit allows the plant to expand the range of orders for its own and external orders

metalurg.online
ArcelorMittal prepares blast furnace №9 for winter

The main task of the blast furnaces was the dehydration of all water conduits of the steel unit

biz.censor.net
ArcelorMittal is in a tense situation — CEO

Additional logistics costs of the enterprise reached $100 per ton

ArcelorMittal resumes the work of the mining department

One of the two enterprise's quarries is already operating, as well as two factories – crushing and ore beneficiation

ArcelorMittal replaced the caisson of converter №2

The unit is used for removal and primary cooling of converter gases, which go to gas treatment plants

Ukrainian iron and steel industry temporarily stops production due to energy supply restrictions

The Ferrexpo company temporarily stopped production at its enterprises, and ArcelorMittal Kryvyi Rih limited capacity. Metinvest enterprises are focused on preventing emergency situations that could potentially arise due to the lack of a stable power supply

ArcelorMittal puts coke batteries №5 and №6 into operation

The units were forced to stop due to the full-scale invasion of the Russian Federation in February 2022

Kryvyi Rih’s minings and industrial enterprises were not injured as a result of the Karachuny reservoir’s destruction

On September 14, 2022, Russia launched a massive missile attack on Kryvyi Rih, damaging the dam of the reservoir

ArcelorMittal helped to deliver 7 tons of humanitarian aid from France

The workers of ArcelorMittal Research&Development were engaged in the collection of cargo in France

ArcelorMittal has started the overhaul of the air heater at blast furnace No. 6

After the repair, the temperature of the hot blast into the furnace can be increased to 1030 °C, which will save fuel

ArcelorMittal repaired railway loading tracks No. 3-4

Repair of tracks in the sinter shop No. 1 will allow the unit to work stably and without unscheduled stops

1 2 3 4 5 8