icon

Dnipro Metallurgical Plant - Latest news GMK Center

Photo – DMZ implements energy-saving projects in wartime conditions
DMZ implements energy-saving projects in wartime conditions

One of the most effective projects this year is the replacement of the equipment of coastal pumping station №2

Photo – DMZ received the largest order for rolling in RS-2 since the beginning of the war
DMZ received the largest order for rolling in RS-2 since the beginning of the war

At the end of May, rolling shop №2 will start fulfilling orders for 17,000 tons of shaft props and profiles

Photo – DMZ produced 35.1 thousand tons of rolled steel in January-April
DMZ produced 35.1 thousand tons of rolled steel in January-April

During this period, coke production increased by 6.5% y/y

Photo – DMZ resumed production of metallurgical coke in March
DMZ resumed production of metallurgical coke in March

The main products of the CCD plant since the beginning of the war have been hard coal coke, coke nuts and coke fines

Photo – DMZ produced 29.2 thousand tons of products in January-March
DMZ produced 29.2 thousand tons of products in January-March

In the first quarter of 2022, DMZ did not produce steel products due to a lack of coal raw materials and military operations

Photo – DMZ produced 16,000 tons of products in rolling shop №2 during February-March
DMZ produced 16,000 tons of products in rolling shop №2 during February-March

The vast majority of the order consisted of the mine rack SVP-27 and several names of channels and angles

Photo – DMZ received an order for the production of a mine skip for Sukha Balka
DMZ received an order for the production of a mine skip for Sukha Balka

The process of producing the skip and the necessary steel structures for the unit will continue until the summer of 2023

Photo – The coke-chemical division of DMZ completely switched to Ukrainian raw materials
The coke-chemical division of DMZ completely switched to Ukrainian raw materials

The transition to domestic raw materials almost did not affect the quality of products, which was previously considered impossible

Photo – DMZ started a production company in the rolling shop №1
DMZ started a production company in the rolling shop №1

The plant fulfills orders for SPV-33 mine racks and R-34 mine rails

Photo – DMZ with volunteers equipped the shelter with cable and generators
DMZ with volunteers equipped the shelter with cable and generators

The equipment is necessary for the full start-up of heating in the shelter on the basis of the former medical and sanitary part of the plant

1 5 6 7 8 9