Sukha Balka resumed tunneling work on the 1,500 m horizon of the Yuvileina mine

In April 2023, Sukha Balka mine, which is part of the DCH Group, resumed tunneling operations with the involvement of self-propelled equipment in the technological process at the 1,500 m horizon of the Yuvileyna mine. This is stated in the corporate newspaper.

“In the confrontation with the aggressor, about 500 miners of the enterprise are now holding their line. The lack of qualified workers had a negative impact on the organization of technological processes of iron ore extraction, which led to the suspension of the implementation of certain production tasks,” the message says.

According to the chief engineer of the mine Igor Piltek, it took a lot of effort to resume work in the main shaft of the Yuvileyna mine.

The miners will use modern mining equipment – a loading and delivery machine and a drilling rig – to drill the workings of the 1,500 m horizon.

“The use of self-propelled machinery at this production site will reduce costs for the preparation and commissioning of production units on the horizon. Currently, the work on establishing communications is ongoing,” the press service notes.

In addition, in April 2023, new production facilities with reserves of 43 thousand tons of iron ore mass were prepared for operation at the mine. The iron content in the massif is 58.47%, and the development of the deposit will take 3 months.

“The block is small, the percentage of iron is high, the deposit is blind. Therefore, the raw materials will remain with the declared quality parameters,” Igor Piltek commented.

Another new block 26-30 in the same deposit (Gnizdo) is also prepared for development. Its reserves amount to 31.5 thousand tons with an iron content of 56.42%.

As GMK Center reported earlier, at the beginning of April 2023, Sukha Balka purchased two loading and delivery vehicles and two DERUI brand loaders. The equipment is planned to be used in the technological process at the new production facilities of the mine.

In 2022, Sukha Balka put into operation about 10 new blocks with a total capacity of 800,000 tons of ore raw materials.

At the beginning of February 2023, the Sukha Balka mine, which is part of the DCH group, commissioned new production facilities at the Yuvileyna mine. The new block 28-30+10 is located at the horizon of 1,420 m. This is the «Gnizdo 1-2» deposit of the lying pack of the horizon’s first sub-floor with a raw material reserve of 125.6 thousand tons. The iron content is 60.6%. In March, the mine began to operate another block, the capacity of which reaches 130 thousand tons.

The Sukha Balka mine specializes in underground iron ore mining with a capacity of about 3.1 million tons per year. The mining includes the mines Frunze and the Yuvileyna.

Share
Published by
Masha Malonog
Tags: iron ore Sukha Balka iron ore mining
  • Global Market

Europe needs a breakthrough in industrial policy – Federacciai

Antonio Gozzi, President of the Italian Steel Producers Association Federacciai, called for a turnaround in…

Sunday May 11, 2025
  • Global Market

Turkish scrap prices increased by $8/t in early May

Quotations for HMS 1&2 (80:20) scrap in Turkey increased from $330/t to $338/t CFR from…

Saturday May 10, 2025
  • Companies

Emsteel presents the first green finance framework program

Emsteel, the parent company of Emirates Steel, has launched the first green finance framework to…

Saturday May 10, 2025
  • State

Ukraine’s trade turnover amounted to $38.1 billion in January-April

Ukraine's trade turnover in January-April 2024 amounted to $38.1 billion. This is evidenced by the…

Friday May 9, 2025
  • State

Ukrcement urges authorities to appeal to the EU to postpone CBAM

Ukrcement, the Association of Cement Producers of Ukraine, is calling on the Cabinet of Ministers…

Friday May 9, 2025
  • Global Market

European Commission starts consultations on possible response to US tariffs

The European Commission has launched a public consultation on a list of imports from the…

Friday May 9, 2025