Sukha Balka commissioned a unit with reserves of 71,000 tons of iron ore

The Sukha Balka mine, which is part of the DCH group, put into operation a new production capacity with reserves of over 71,000 tons of iron ore in May. It is stated in the company’s corporate newspaper.

Block 37-45 is located at the -1340 m horizon in the «Main» deposit of the Yuvileina mine. Project reserves of the block amount to 71.3 thousand tons. The iron content in the iron ore massif is 59.62%. The peculiarity of this resource center is the strength of the rock, which sometimes reaches the mark of 14 points.

«If the rock is strong, it affects the organization of the technological process. In such conditions, it is necessary to involve appropriate machinery and equipment. But the geological characteristics did not prevent the miners from carrying out cutting operations in the planned period», noted the chief engineer of the Yuvileyna mine, Mykola Puntus.

The new unit was developed with the help of self-propelled equipment, in particular, a drilling carriage and delivery vehicles with a bucket capacity of 1 and 0.6 m3.

«Miners plan to complete production at this production facility in 4 months. Currently, clean-up excavation is underway and new production units are being prepared for further operation,» the message says.

As GMK Center reported earlier, in April 2023, Sukha Balka resumed tunneling works with the involvement of self-propelled equipment in the technological process at the 1,500 m horizon of the Yuvileyna mine.

In addition, in April, new production facilities with reserves of 43,000 tons of iron ore mass were prepared for operation at the mine. The iron content in the massif is 58.47%, and the development of the deposit will take 3 months. Another new block 26-30 in the same deposit («Gnizdo») is also prepared for development. Its reserves amount to 31.5 thousand tons with an iron content of 56.42%.

In 2022, Sukha Balka put into operation about 10 new blocks with a total capacity of 800,000 tons of iron ore.

The Sukha Balka mine specializes in underground iron ore mining with a capacity of about 3.1 million tons per year. The mining includes the mines Frunze and the Yuvileyna.

  • Global Market

EUROFER calls for immediate action over 50% US steel duty

The European Steel Association EUROFER is calling on the European Commission to immediately implement the…

Wednesday June 4, 2025
  • Companies

LIBERTY Galați resumes production after a year of downtime

After almost a year of downtime, Romania's largest steel mill, LIBERTY Galați, has resumed production…

Wednesday June 4, 2025
  • Companies

Interpipe starts supplying casing for the Italian salt industry

Ukrainian industrial company Interpipe is expanding its presence in the European market by supplying pipe…

Wednesday June 4, 2025
  • Companies

Qarmet opens office in Singapore as part of its international expansion strategy

Kazakhstan's Qarmet Iron and Steel Works has opened an office in Singapore as part of…

Wednesday June 4, 2025
  • Companies

Huta Czestochowa has produced over 100 thousand tons of steel since its restart in January

Polish steelmaker Huta Czestochowa has produced more than 100 thousand tons of steel since it…

Wednesday June 4, 2025
  • Global Market

Trump raises tariffs on steel and aluminum imports to the US to 50%

US President Donald Trump has raised duties on steel and aluminum imports from 25% to…

Wednesday June 4, 2025