ArcelorMittal repaired railway loading tracks No. 3-4

ArcelorMittal Kryvyi Rih completed the repair of loading railway tracks No. 3-4 in the sinter shop No. 1. This is stated in press release of newspaper “Metallurg”.

“Railway lines are an integral part of the sinter production process and have a special purpose.  On them the finished products, in this case agglomerate, are loaded into railway cars,” the report says.

Due to old age and significant wear and tear, this section was a bottleneck in the sinter shop No. 1, through which the railcars left. This, in turn, caused the workshop’s sintering machines to stop, since the produced sinter must be immediately shipped and sent for further use.

So, during the forced shutdown of sinter shop No. 1, the workshop workers, together with contractors, dismantled the old tracks, prepared a place for laying a new railway track, and mounted a new one.

In general, almost 350 m of two railway tracks and more than 600 wooden sleepers were renewed in the workshop.

As GMK Center reported earlier, ArcelorMittal resumed after long downtime the work of the small-sized unit DS-250-5 for the production of fittings. On July 7, the heating of the furnace began, and on July 11, the first product was already received at the mill.

ArcelorMittal since July 2022 transfered a significant part of employees, including top management and foreign workers, by 2/3 of the workload due to the inability to pay salaries in full.

Before this plant completed the reconstruction slag yard No. 1 of the converter shop. As a result, the workshop actually received a new slag yard with new equipment and a comfortable change house.

  • Infrastructure

Businesses purchased the entire volume of electricity at the first long-term auctions

The first electricity auctions under the new long-term contract mechanism have taken place in Ukraine.…

Monday July 13, 2026
  • Global Market

India has extended the anti-dumping duty on imports of seamless pipes from China

India has extended the anti-dumping duty on imports of seamless pipes, tubes and hollow sections…

Monday July 13, 2026
  • Companies

Jingye Steel will insist on full compensation for the takeover of British Steel

China’s Jingye Steel has stated that it will demand prompt, adequate and effective compensation from…

Monday July 13, 2026
  • Global Market

EU decision on steel quotas poses further challenges for Ukraine – Politico

On 1 July, new EU safeguard measures on steel came into force after the European…

Monday July 13, 2026
  • Global Market

JSW Italy has reached an agreement with the Italian government on the development of the Piombino steelworks

The Italian Ministry of Economic Development (Mimit) has reached an agreement with JSW on the…

Monday July 13, 2026
  • Global Market

Baosteel is raising prices for hot-rolled steel for August sales

Baoshan Iron & Steel (Baosteel), a subsidiary of the world’s leading steel producer China Baowu…

Monday July 13, 2026