Dnipro Metallurgical Plant (DMZ) launched the blast furnace No. 2 after repair, according to a report of the Company’s press service to GMC Center.
The plant performed the blowing-in of the blast furnace and is currently preparing it for operation. The launch of the basic oxygen furnace and rolling shops are coming up next.
“Tremendous work was done to launch the blast furnace No. 2. We needed to solve the problem of raw material supplies. Yet we coped with this challenge. And I am sure that all our production plans and goals will be achieved,” says Vitaliy Bash, CEO at DCH Steel and DMZ.
DMZ has already sounded the first horn following the completion of repair works in its main shops. The plant plans to export the first batch of metal products from Kaydakskaya railway station on 10 June.
Dnipro Metallurgical Plant is an integrated steelmaking company, a part of the DCH Group. It produces semi-finished and long products: channels, angles and rails.
Its main products are square billets (exported to Turkey and Egypt), channels (wide export geography: countries of Europe, Asia, Africa) and pig iron (exported mainly to Turkey).
In 2019, DMZ cut production of rolled products by 43% to 449 thousand tons against the previous year.
China's leading steelmaker Baosteel has maintained current prices for flat products for sale on the…
Metinvest Group increased steel production by 4% year-on-year to 488 thousand tons in January-March 2025.…
As part of its scheduled overhaul, Kametstal has upgraded Ladle Furnace No. 1 (LF-1), which…
The European steel industry is still not fully prepared for the gradual implementation of the…
Offers for rebar in India fell from $689/t to $681/t EXW Mumbai for the period…
On May 12, 2025, the coke plant Koksownia Przyjaźń (Poland), part of JSW KOKS SA…