Sukha Balka

Sukha Balka suspended work due to repairs and power outages

Scheduled repairs of the loading and dosing complex were carried out at the Yuvileina mine

Суха Балка
Sukha Balka temporarily suspended technological processes at the Frunze mine

This decision was made in the conditions of reduced production volumes, consumption of raw materials and limited supply of energy resources

Sukha Balka mine increased net sales by 3.6 times in 2021

For the year, the company's net sales amounted to UAH 1.33 billion compared to UAH 366.8 million in 2020

Sukha Balka built a new pumping station for fire extinguishing needs

The existing fire extinguishing system did not provide the standard pressure in the fire pipeline

Sukha Balka repaired the technological equipment of the Yuvileina mine

Specialists have updated the elements of the loading dispenser and the sector shutter of the mine skip

Sukha Balka mining reached pre-war levels of iron ore production

DCH Steel also announced a partial resumption of production at the Dnipro Metallurgical Plant

Сухая Балка инвестирует в технику © sukhabalka.com
Sukha Balka Mining and Processing Plant to invest UAH 137 million in self-propelled machinery in 2019

The plant has already put a new drilling rig and a loader into operation

24tv.ua
Sukha Balka is going to take a $30 million loan from Oschadbank

At the same time, the minery will become DMZ’s guarantor for a similar credit facility

1 2 3