ArcelorMittal

ArcelorMittal has started the overhaul of the air heater at blast furnace No. 6

After the repair, the temperature of the hot blast into the furnace can be increased to 1030 °C, which will save fuel

ArcelorMittal repaired railway loading tracks No. 3-4

Repair of tracks in the sinter shop No. 1 will allow the unit to work stably and without unscheduled stops

«АрселорМиттал» изготовил 56 противотанковых ежей (с) АрселорМиттал
ArcelorMittal launched a small section rebar mill

The first batch of rebar has neen recently made at the DS-250-5 unit

weser-kurier.de
ArcelorMittal Bremen reduced working hours for rolling mills workers

In the blast-furnace-oxygen converter steel production to continue

ArcelorMittal has completed the reconstruction of the slag yard №1

The shop got a slag yard with new equipment and a comfortable living space

EU court blocks establishment of Thyssenkrupp and Tata Steel joint venture

The joint venture could become the second largest steel producer in Europe

Ukrzaliznytsia limits ArcelorMittal’s shipments to Poland

And introduces convention on iron ore shipments through Izov-Hrubieszów border crossing on June 19

ArcelorMittal launched №5 oxygen converter after a 3-month downtime

The company has six such converters; only one, equipped with a slag separation system, launched

ArcelorMittal launches converter and continuous billet casting machine

Earlier, the company launched a blast furnace, two coke batteries, three filling machines and a rolling mill

ArcelorMittal paid over UAH 6 billion of taxes in January-May

Over UAH 3.3 billion was paid to the state budget, and UAH 861 million – to the local budget

ArcelorMittal has launched rolling mill №3

The shop produced the first after a long break 160 tons of wire rod with a diameter of 11 mm

ArcelorMittal established shipments of metal products to Polish ports

The company claims an increase in logistics costs and difficulties with direct deliveries

1 15 16 17 18 19