Sukha Balka has prepared a new block with reserves of over 60 ths tons of ore

Sukha Balka Mine, a part of DCH Steel Group, has prepared another block with reserves of over 60 ths tons of ore at Yubileynaya mine for mining. This is stated in the company’s corporate newspaper.

The new block 36+10-40 from the Gnezdo deposit is located on the second sub-floor of the -1420 m horizon. Its preparation for operation was carried out by miners of the No. 19 section, and mining will be provided by miners of the No. 18 section.

According to Nikolay Puntus, Chief Engineer of Yubileynaya Mine, there is a constant shortage of personnel and a lack of labor reserve due to the difficult wartime conditions. To prepare the unit, workers had to be involved from all areas of the mine – cutting and mining.

The new production unit will supply raw materials to the mine for the next 2.5 months. The unit’s reserves amount to 62.1 ths tons with an iron content of 60.37%. Mining will be carried out using the traditional method (scraper winch).

In the fall, Sukha Balka commissioned two blocks with reserves of 170 ths tons. Since the beginning of the year, the company has launched 9 blocks with total reserves of 1 million tons of ore. At the beginning of September, the company commissioned blocks 39-45 at Frunze mine with reserves of 55 ths tons of high-quality ore. In October, Yubileynaya Mine commissioned block 34-36 +10 of the second floor of the Gnezdo deposit with reserves of 115 ths tons.

As GMK Center reported earlier, the mine produced almost 931 ths tons of commercial iron ore in 2023. Last year, the company operated in the mode of maximum resource conservation.

  • Infrastructure

200 million tonnes of cargo have been transported via the Ukrainian maritime corridor

Since its launch in September 2023, the Ukrainian maritime corridor has already handled 200 million…

Thursday June 4, 2026
  • Global Market

The UK has announced the details of the transition period for steel safeguard measures

The UK Department for Business and Trade (DBT) has published details of a transitional phase…

Thursday June 4, 2026
  • Global Market

Canada will extend its tariffs on steel and aluminium imports for a further year

Canada will extend tariff rate quotas (TRQs) and preferential tariffs on imports of certain types…

Thursday June 4, 2026
  • Global Market

Global scrap consumption rose by 4.5% y/y in 2025 — BIR

Global scrap consumption rose by 4.5% compared with the previous year, reaching 480 million tonnes,…

Thursday June 4, 2026
  • Companies

Worthington Steel has completed the acquisition of Klöeckner

The US-based Worthington Steel has completed its voluntary public takeover bid for Klöeckner & Co…

Thursday June 4, 2026
  • Companies

Voestalpine forecasts a rise in profits amid new EU protective measures

Austrian steel producer voestalpine expects profits to rise in the 2026/2027 financial year against the…

Wednesday June 3, 2026