<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>capital investment News — GMK Center</title>
	<atom:link href="https://gmk.center/en/tag/capital-investment/feed/" rel="self" type="application/rss+xml" />
	<link>https://gmk.center/en/tag/capital-investment/</link>
	<description>This is an informational-analytical, discussion platform</description>
	<lastBuildDate>Tue, 23 Jun 2026 14:22:16 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://gmk.center/wp-content/uploads/2018/11/android-chrome-256x256-36x36.png</url>
	<title>capital investment News — GMK Center</title>
	<link>https://gmk.center/en/tag/capital-investment/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title><![CDATA[Capital investment in Ukraine’s steel sector have risen for the first time by 17.5% y/y in 2025 since the war began]]></title>
		<link>https://gmk.center/en/posts/capital-investment-in-ukraine-s-steel-sector-have-risen-for-the-first-time-by-17-5-y-y-in-2025-since-the-war-began/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 24 Jun 2026 06:00:09 +0000</pubDate>
				<category><![CDATA[Industry]]></category>
		<category><![CDATA[ArcelorMittal Kryvyi Rih]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[capital investments]]></category>
		<category><![CDATA[Ferrexpo]]></category>
		<category><![CDATA[Interpipe]]></category>
		<category><![CDATA[Metinvest]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=posts&#038;p=125361</guid>

					<description><![CDATA[<p>In 2025, capital investment by Ukrainian iron and steel companies had risen for the first time since the start of the full-scale war, increasing by 17.5 per cent to $579 million. Companies were actively investing in energy independence, maintaining production capacity and even acquiring overseas assets. However, the start of 2026 brought new challenges: the [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/posts/capital-investment-in-ukraine-s-steel-sector-have-risen-for-the-first-time-by-17-5-y-y-in-2025-since-the-war-began/" data-wpel-link="internal">Capital investment in Ukraine’s steel sector have risen for the first time by 17.5% y/y in 2025 since the war began</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Capital investment in Ukraine rose by 5.1 per cent y/y in Q1]]></title>
		<link>https://gmk.center/en/news/capital-investment-in-ukraine-rose-by-5-1-per-cent-y-y-in-q1/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Thu, 18 Jun 2026 10:36:25 +0000</pubDate>
				<category><![CDATA[State]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[macroeconomics]]></category>
		<category><![CDATA[capital investments]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=125176</guid>

					<description><![CDATA[<p>Capital investment in January–March this year rose by 5.1 per cent year-on-year to 130.1 billion hryvnias, according to the State Statistics Service. Over 41 per cent, or 53.6 billion hryvnias, of the total value of capital investment was accounted for by industry. Around 13 per cent, or 16.5 billion hryvnias, went to agriculture, forestry and [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/capital-investment-in-ukraine-rose-by-5-1-per-cent-y-y-in-q1/" data-wpel-link="internal">Capital investment in Ukraine rose by 5.1 per cent y/y in Q1</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Zaporizhstal is set to increase spending on major crane repairs by almost sevenfold in 2026]]></title>
		<link>https://gmk.center/en/news/zaporizhstal-is-set-to-increase-spending-on-major-crane-repairs-by-almost-sevenfold-in-2026/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Mon, 15 Jun 2026 10:24:23 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Zaporizhstal]]></category>
		<category><![CDATA[modernization of production facilities]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=124930</guid>

					<description><![CDATA[<p>The Zaporizhstal Steelworks continues to systematically upgrade its lifting machinery and crane equipment. While Zaporizhstal carried out major repairs to crane equipment worth 13.6 million UAH in 2025, the cost of similar repairs will amount to 90 million UAH in 2026. This is stated in the company’s press release. In 2025, the company carried out [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/zaporizhstal-is-set-to-increase-spending-on-major-crane-repairs-by-almost-sevenfold-in-2026/" data-wpel-link="internal">Zaporizhstal is set to increase spending on major crane repairs by almost sevenfold in 2026</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal has upgraded a key component of its pulverized coal fuel system]]></title>
		<link>https://gmk.center/en/news/kametstal-has-upgraded-a-key-component-of-its-pulverized-coal-fuel-system/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Tue, 12 May 2026 03:41:03 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[Kametstal]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[capital investment]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=123497</guid>

					<description><![CDATA[<p>At the Kametstal steelworks, part of the Metinvest Group, a major overhaul of grinding circuit No. 2 of the pulverized coal fuel (PCF) complex has been completed, marking an important step in the modernization of blast furnace production. The upgrade is aimed at improving equipment reliability and energy efficiency, according to a press release. PFC [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-has-upgraded-a-key-component-of-its-pulverized-coal-fuel-system/" data-wpel-link="internal">Kametstal has upgraded a key component of its pulverized coal fuel system</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal received $440,000 in benefits from its new lining technology]]></title>
		<link>https://gmk.center/en/news/kametstal-received-440-000-in-benefits-from-its-new-lining-technology/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 06 May 2026 03:30:07 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[Kametstal]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[capital investment]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=123289</guid>

					<description><![CDATA[<p>The converter shop at the Kametstal steel mill, part of the Metinvest Group, achieved a record result by extending the service life of the lining in Converter No. 2 by 1,315 smelting runs. With a guaranteed refractory life of 4,500 melts, the actual figure reached 5,815, representing a 29% increase, according to a press release. [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-received-440-000-in-benefits-from-its-new-lining-technology/" data-wpel-link="internal">Kametstal received $440,000 in benefits from its new lining technology</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[ArcelorMittal Poland has restarted blast furnace No. 3 in Dąbrowa Górnicza]]></title>
		<link>https://gmk.center/en/news/arcelormittal-poland-has-restarted-blast-furnace-no-3-in-dabrowa-gornicza/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Fri, 01 May 2026 07:53:07 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[ArcelorMittal]]></category>
		<category><![CDATA[Poland]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=123184</guid>

					<description><![CDATA[<p>ArcelorMittal Poland, the Polish subsidiary of global steel producer ArcelorMittal, has resumed operations at blast furnace No. 3 at its steelworks in Dąbrowa Górnicza following a several-month shutdown caused by challenging market conditions. This was announced in a company press release. The unit was blown in on the evening of April 28, and the first [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/arcelormittal-poland-has-restarted-blast-furnace-no-3-in-dabrowa-gornicza/" data-wpel-link="internal">ArcelorMittal Poland has restarted blast furnace No. 3 in Dąbrowa Górnicza</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal has completed the overhaul of ladle furnace No. 1]]></title>
		<link>https://gmk.center/en/news/kametstal-has-completed-the-overhaul-of-ladle-furnace-no-1/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 29 Apr 2026 07:59:21 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[Kametstal]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[capital investment]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=123072</guid>

					<description><![CDATA[<p>The Kametstal steel Plant has completed a major overhaul of ladle furnace No. 1 in the converter shop. The unit has already resumed operations and is operating in a rotating cycle with unit No. 2, according to a press release. The ladle furnace is a crucial part of the steelmaking process, where steel undergoes final [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-has-completed-the-overhaul-of-ladle-furnace-no-1/" data-wpel-link="internal">Kametstal has completed the overhaul of ladle furnace No. 1</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[ArcelorMittal Poland has completed preparations for the restart of blast furnace No. 3]]></title>
		<link>https://gmk.center/en/news/arcelormittal-poland-has-completed-preparations-for-the-restart-of-blast-furnace-no-3/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Mon, 27 Apr 2026 10:52:58 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[Poland]]></category>
		<category><![CDATA[ArcelorMittal]]></category>
		<category><![CDATA[capital investment]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=123008</guid>

					<description><![CDATA[<p>ArcelorMittal Poland has completed preparations for the restart of blast furnace No. 3 at its site in Dąbrowa Górnicza. The project cost 60 million zlotys, and its implementation is expected to restore the plant’s full production capacity, according to a press release. The company announced the completion of the work during the official launch of [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/arcelormittal-poland-has-completed-preparations-for-the-restart-of-blast-furnace-no-3/" data-wpel-link="internal">ArcelorMittal Poland has completed preparations for the restart of blast furnace No. 3</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal is carrying out a major overhaul of blast furnace No. 9]]></title>
		<link>https://gmk.center/en/news/kametstal-is-carrying-out-a-major-overhaul-of-blast-furnace-no-9/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Sat, 25 Apr 2026 07:02:57 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Kametstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=122970</guid>

					<description><![CDATA[<p>At the Kametstal steelworks, part of the Metinvest Group, a third-class overhaul of blast furnace No. 9 is underway this week. The work is being carried out on a “blitz” schedule, which allows for the rapid replacement of critical equipment and minimizes the unit’s downtime, according to a press release. One of the key tasks [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-is-carrying-out-a-major-overhaul-of-blast-furnace-no-9/" data-wpel-link="internal">Kametstal is carrying out a major overhaul of blast furnace No. 9</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal has completed a major overhaul of Converter No. 2]]></title>
		<link>https://gmk.center/en/news/kametstal-has-completed-a-major-overhaul-of-converter-no-2/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Thu, 09 Apr 2026 07:12:09 +0000</pubDate>
				<category><![CDATA[Industry]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Kametstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=122412</guid>

					<description><![CDATA[<p>At the Kametstal steel mill, part of the Metinvest Group, a program of major overhauls of key production equipment for 2026 has begun. The first major phase was the overhaul of Converter No. 2 in the converter shop, according to a press release. The key task was to replace 860 tons of refractory lining that [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-has-completed-a-major-overhaul-of-converter-no-2/" data-wpel-link="internal">Kametstal has completed a major overhaul of Converter No. 2</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[ArcelorMittal has completed a $1.1 billion investment in Brazil&#8217;s green energy sector]]></title>
		<link>https://gmk.center/en/news/arcelormittal-has-completed-a-1-1-billion-investment-in-brazil-s-green-energy-sector/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Tue, 07 Apr 2026 08:16:39 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[ArcelorMittal]]></category>
		<category><![CDATA[decarbonization]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=122323</guid>

					<description><![CDATA[<p>ArcelorMittal Brasil has completed a $1.1 billion investment program in its own renewable energy generation in the country following the commissioning of a solar park at the Babilônia Centro complex in the municipality of Varzea Nova, Bahia state. The new 200-MW plant began operations in March of this year, according to a press release. The [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/arcelormittal-has-completed-a-1-1-billion-investment-in-brazil-s-green-energy-sector/" data-wpel-link="internal">ArcelorMittal has completed a $1.1 billion investment in Brazil&#8217;s green energy sector</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[South Korea has approved the site for POSCO&#8217;s hydrogen-based DRI plant]]></title>
		<link>https://gmk.center/en/news/south-korea-has-approved-the-site-for-posco-s-hydrogen-based-dri-plant/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Sat, 04 Apr 2026 07:16:15 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[POSCO]]></category>
		<category><![CDATA[South Korea]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=122255</guid>

					<description><![CDATA[<p>South Korean authorities have finally approved the site for POSCO’s project to build a hydrogen-based steel complex in Pohang. According to SteelOrbis, citing local media, South Korea’s Ministry of Land, Infrastructure, and Transport has approved amendments to the Pohang National Industrial Complex plan, paving the way for the creation of a special industrial zone near [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/south-korea-has-approved-the-site-for-posco-s-hydrogen-based-dri-plant/" data-wpel-link="internal">South Korea has approved the site for POSCO&#8217;s hydrogen-based DRI plant</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[ArcelorMittal has launched a new phase of its electrical steel project in France]]></title>
		<link>https://gmk.center/en/news/arcelormittal-has-launched-a-new-phase-of-its-electrical-steel-project-in-france/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Thu, 02 Apr 2026 12:43:28 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[France]]></category>
		<category><![CDATA[ArcelorMittal]]></category>
		<category><![CDATA[capital investment]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=122213</guid>

					<description><![CDATA[<p>ArcelorMittal France announced the production of the first coil on the new electrical steel production line at its site in Mardic. The company described this stage as crucial for further fine-tuning of equipment and industrial processes ahead of a gradual ramp-up to steady-state production and the final validation of all lines to ensure the supply [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/arcelormittal-has-launched-a-new-phase-of-its-electrical-steel-project-in-france/" data-wpel-link="internal">ArcelorMittal has launched a new phase of its electrical steel project in France</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Zaporizhstal allocated 9.8 million UAH for the repair of hot rolling mills]]></title>
		<link>https://gmk.center/en/news/zaporizhstal-allocated-9-8-million-uah-for-the-repair-of-hot-rolling-mills/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Sat, 28 Mar 2026 07:05:16 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Zaporizhstal]]></category>
		<category><![CDATA[capital investment]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=121988</guid>

					<description><![CDATA[<p>At the Zaporizhstal Steel Works, part of the Metinvest Group, the first phase of the major overhaul of the Slabbing 1150 and BTLS-1680 rolling mills in the hot rolling shop has been completed. The total investment in this phase of the overhaul amounted to UAH 9.8 million, according to a press release from the company. [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/zaporizhstal-allocated-9-8-million-uah-for-the-repair-of-hot-rolling-mills/" data-wpel-link="internal">Zaporizhstal allocated 9.8 million UAH for the repair of hot rolling mills</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Pittini begins modernization of Siderpotenza rolling mill in Italy]]></title>
		<link>https://gmk.center/en/news/pittini-begins-modernization-of-siderpotenza-rolling-mill-in-italy/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 21 Jan 2026 09:56:11 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Italy]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=118978</guid>

					<description><![CDATA[<p>Italian metallurgical company Pittini has commissioned Danieli to implement a project to modernize the rolling mill at Siderpotenza, which will be an important step in improving production efficiency and environmental sustainability of the asset. This is stated in the company’s press release. The project is part of Pittini’s long-term strategy aimed at developing industrial capacity, [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/pittini-begins-modernization-of-siderpotenza-rolling-mill-in-italy/" data-wpel-link="internal">Pittini begins modernization of Siderpotenza rolling mill in Italy</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Central Mining has completed scheduled overhaul of pelletizing plant]]></title>
		<link>https://gmk.center/en/news/central-mining-has-completed-scheduled-overhaul-of-pelletizing-plant/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Thu, 25 Dec 2025 08:56:47 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Central GOK]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=118278</guid>

					<description><![CDATA[<p>The Central Mining and Processing Plant (Central Mining), part of the Metinvest Group, has completed another scheduled overhaul of its pelletizing plant, a key unit for the manufacture of commercial products. This was reported by Metinves.Media. Such work is carried out twice a year at the enterprise and is aimed at restoring and replacing critically [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/central-mining-has-completed-scheduled-overhaul-of-pelletizing-plant/" data-wpel-link="internal">Central Mining has completed scheduled overhaul of pelletizing plant</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Northern Mining automates control systems to improve safety]]></title>
		<link>https://gmk.center/en/news/northern-mining-automates-control-systems-to-improve-safety/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 17 Dec 2025 08:06:11 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Northern GOK]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=117721</guid>

					<description><![CDATA[<p>Metinvest Group’s Northern Mining and Processing Plant (Northern Mining ) is continuing to implement automated process control systems (APCS) aimed at improving occupational safety, stabilizing product quality, and making more efficient use of resources. This is according to a statement by Metinvest.Media. The 2024-2025 projects cover key production areas and involve the extensive modernization of [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/northern-mining-automates-control-systems-to-improve-safety/" data-wpel-link="internal">Northern Mining automates control systems to improve safety</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal has completed the reconstruction of continuous casting machine No. 1]]></title>
		<link>https://gmk.center/en/news/kametstal-has-completed-the-reconstruction-of-continuous-casting-machine-no-1/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Fri, 05 Dec 2025 12:32:41 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Kametstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=117177</guid>

					<description><![CDATA[<p>As part of the 2025 investment program, the converter shop at the Kametstal steel plant, part of the Metinvest Group, has completed the reconstruction of continuous casting machine No. 1 (CCM-1). This is stated in the company’s press release. The second stage of the project involved upgrading key equipment for the pull-straightening devices, which ensure [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-has-completed-the-reconstruction-of-continuous-casting-machine-no-1/" data-wpel-link="internal">Kametstal has completed the reconstruction of continuous casting machine No. 1</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Zaporizhstal invested UAH 40.3 million in the overhaul of the PRK-5 car dumper]]></title>
		<link>https://gmk.center/en/news/zaporizhstal-invested-uah-40-3-million-in-the-overhaul-of-the-prk-5-car-dumper/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Tue, 02 Dec 2025 09:52:14 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Zaporizhstal]]></category>
		<category><![CDATA[capital investment]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=116976</guid>

					<description><![CDATA[<p>In November 2025, Metinvest Group’s Zaporizhstal steelworks successfully completed a major overhaul of the PRK-5 car dumper, one of the company’s key logistics facilities, which handles around 250 railcars carrying raw materials weighing 70 tons each every day. The total cost of the overhaul was UAH 40.3 million, according to a press release from the [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/zaporizhstal-invested-uah-40-3-million-in-the-overhaul-of-the-prk-5-car-dumper/" data-wpel-link="internal">Zaporizhstal invested UAH 40.3 million in the overhaul of the PRK-5 car dumper</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Zaporizhstal has invested UAH 370 million in the overhaul of its main units since the beginning of the year]]></title>
		<link>https://gmk.center/en/news/zaporizhstal-has-invested-uah-370-million-in-the-overhaul-of-its-main-units-since-the-beginning-of-the-year/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Tue, 18 Nov 2025 12:20:36 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Zaporizhstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=116187</guid>

					<description><![CDATA[<p>Metinvest Group’s Zaporizhstal steelworks continues to implement its annual capital investment program aimed at supporting the stable operation of production facilities and environmental equipment. In 2025, the plant completed a large-scale repair of the main units in the blast furnace, open-hearth, and hot rolling shops. The total budget for the work was UAH 370 million, [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/zaporizhstal-has-invested-uah-370-million-in-the-overhaul-of-its-main-units-since-the-beginning-of-the-year/" data-wpel-link="internal">Zaporizhstal has invested UAH 370 million in the overhaul of its main units since the beginning of the year</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Zaporizhkcoke invested UAH 3.7 million in the modernization of stacker No. 2]]></title>
		<link>https://gmk.center/en/news/zaporizhkcoke-invested-uah-3-7-million-in-the-modernization-of-stacker-no-2/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Thu, 13 Nov 2025 10:54:58 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Zaporizhcoke]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=115920</guid>

					<description><![CDATA[<p>PJSC Zaporizhkcoke, one of Ukraine’s largest producers of coke for metallurgy, has resumed operation of the No. 2 rotary-mobile stacker in the coal preparation section of the coke plant following a major overhaul. The total investment in the restoration of the unit amounted to UAH 3.7 million. This is stated in the company’s press release. [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/zaporizhkcoke-invested-uah-3-7-million-in-the-modernization-of-stacker-no-2/" data-wpel-link="internal">Zaporizhkcoke invested UAH 3.7 million in the modernization of stacker No. 2</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[DMZ plans to produce 6.3 thousand tons of rolled steel during the November campaign]]></title>
		<link>https://gmk.center/en/news/dmz-plans-to-produce-6-3-thousand-tons-of-rolled-steel-during-the-november-campaign/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Thu, 06 Nov 2025 08:51:03 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Dnipro Metallurgical Plant]]></category>
		<category><![CDATA[DCH Steel]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=115518</guid>

					<description><![CDATA[<p>Next week, the Dnipro Metallurgical Plant (DMP), part of the DCH Steel group, will launch a production campaign in rolling mill No. 2 (RM-2). The company plans to produce 6,300 tons of rolled steel, including channels of various sizes in accordance with European standards and DSTU, according to the DCH corporate newspaper. During preparations for [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/dmz-plans-to-produce-6-3-thousand-tons-of-rolled-steel-during-the-november-campaign/" data-wpel-link="internal">DMZ plans to produce 6.3 thousand tons of rolled steel during the November campaign</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[ArcelorMittal Kryvyi Rih has resumed operation of coke oven battery No. 5]]></title>
		<link>https://gmk.center/en/news/arcelormittal-kryvyi-rih-has-resumed-operation-of-coke-oven-battery-no-5/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Tue, 04 Nov 2025 11:19:35 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=115389</guid>

					<description><![CDATA[<p>After 483 days of downtime, the ArcelorMittal Kryvyi Rih steelworks restarted coke oven battery No. 5 in coke shop No. 1. On October 20, the first batch of coal charge was loaded into furnace No. 502, and on October 22, the first coke was produced. This moment marked the official resumption of the unit’s operation [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/arcelormittal-kryvyi-rih-has-resumed-operation-of-coke-oven-battery-no-5/" data-wpel-link="internal">ArcelorMittal Kryvyi Rih has resumed operation of coke oven battery No. 5</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal renovates coke production disintegration building]]></title>
		<link>https://gmk.center/en/news/kametstal-renovates-coke-production-disintegration-building/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Mon, 03 Nov 2025 09:29:53 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Kametstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=115308</guid>

					<description><![CDATA[<p>A large-scale investment project is underway at the Kametstal Iron and Steel Plant, part of the Metinvest Group, to reconstruct the disintegration department of the coke plant. The aim is to extend the reliable operation and improve the safety of this key coke production unit, according to a press release. The coal preparation department performs [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-renovates-coke-production-disintegration-building/" data-wpel-link="internal">Kametstal renovates coke production disintegration building</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal starts overhaul of gas pipeline for coke production]]></title>
		<link>https://gmk.center/en/news/kametstal-starts-overhaul-of-gas-pipeline-for-coke-production/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 29 Oct 2025 10:37:06 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Kametstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=115110</guid>

					<description><![CDATA[<p>The Kametstal Iron and Steel Plant, part of the Metinvest Group, has begun major repairs on the coke oven gas pipeline in the primary gas refrigerators section of the coking chemical products capture workshop. The work is being carried out as part of the Gas Safety-2025 program on the instructions of the company’s CEO, according [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-starts-overhaul-of-gas-pipeline-for-coke-production/" data-wpel-link="internal">Kametstal starts overhaul of gas pipeline for coke production</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[DMZ to build a new water pipeline to save energy and reduce water losses]]></title>
		<link>https://gmk.center/en/news/dmz-to-build-a-new-water-pipeline-to-save-energy-and-reduce-water-losses/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Sun, 26 Oct 2025 07:37:36 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Dnipro Metallurgical Plant]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=114925</guid>

					<description><![CDATA[<p>The Dnipro Metallurgical Plant (DMP) plans to implement a large-scale project aimed at saving energy resources and improving the efficiency of water supply. The company will build a new water pipeline to supply technical water from coastal pumping station No. 1 to the treatment facilities that serve rolling mill No. 2, according to the corporate [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/dmz-to-build-a-new-water-pipeline-to-save-energy-and-reduce-water-losses/" data-wpel-link="internal">DMZ to build a new water pipeline to save energy and reduce water losses</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal starts construction of a new blast furnace gas collector]]></title>
		<link>https://gmk.center/en/news/kametstal-starts-construction-of-a-new-blast-furnace-gas-collector/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Mon, 20 Oct 2025 07:54:55 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Kametstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=114611</guid>

					<description><![CDATA[<p>The Kametstal metallurgical plant, part of the Metinvest Group, has launched a large-scale construction project for a new blast furnace gas collector in accordance with its capital investment program for 2025. This was announced in a press release from the company. The blast furnace gas collector is a key element of the company’s technological infrastructure. [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-starts-construction-of-a-new-blast-furnace-gas-collector/" data-wpel-link="internal">Kametstal starts construction of a new blast furnace gas collector</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal has begun major repairs on its 400/200 rolling mill]]></title>
		<link>https://gmk.center/en/news/kametstal-has-begun-major-repairs-on-its-400-200-rolling-mill/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Tue, 14 Oct 2025 08:32:27 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Kametstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=114403</guid>

					<description><![CDATA[<p>The rolling shop of the Kametstal metallurgical plant, part of the Metinvest Group, has begun modernizing the plant’s main rolling mill, 400/200, which will be operating at full capacity in 2025, according to a press release. The main objectives of the repair work are to increase the reliability of key units and reduce energy costs. [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-has-begun-major-repairs-on-its-400-200-rolling-mill/" data-wpel-link="internal">Kametstal has begun major repairs on its 400/200 rolling mill</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal has begun a series of major repairs to its rolling equipment]]></title>
		<link>https://gmk.center/en/news/kametstal-has-begun-a-series-of-major-repairs-to-its-rolling-equipment/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 08 Oct 2025 08:21:33 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Kametstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=114185</guid>

					<description><![CDATA[<p>The Kametstal steel plant (Metinvest Group) has launched a series of major overhauls of its main rolling equipment as part of its 2025 program. The first object of the large-scale upgrade was the pipe mill, which produces SVP-27 mine props and blanks for large-diameter grinding balls, according to a press release. The main focus of [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-has-begun-a-series-of-major-repairs-to-its-rolling-equipment/" data-wpel-link="internal">Kametstal has begun a series of major repairs to its rolling equipment</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Central Mining upgrades main conveyors with modern drive systems]]></title>
		<link>https://gmk.center/en/news/central-mining-upgrades-main-conveyors-with-modern-drive-systems/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Thu, 25 Sep 2025 13:06:14 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Central GOK]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=113752</guid>

					<description><![CDATA[<p>The crushing plant at Central Mining and Processing Plant (Central Mining and Processing Plant, Metinvest) is continuing its program to upgrade the drive gearboxes of its conveyors. The program began two years ago with the replacement and repair of components of the K-2 main conveyor, which is one of the factory’s key transport lines, according [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/central-mining-upgrades-main-conveyors-with-modern-drive-systems/" data-wpel-link="internal">Central Mining upgrades main conveyors with modern drive systems</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Kametstal is upgrading equipment at coke oven battery No. 5]]></title>
		<link>https://gmk.center/en/news/kametstal-is-upgrading-equipment-at-coke-oven-battery-no-5/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 24 Sep 2025 07:09:36 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Kametstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=113678</guid>

					<description><![CDATA[<p>Work is continuing in the coke shop of the Kametstal metallurgical plant to upgrade the equipment of coke oven battery No. 5 as part of the 2025 capital repair program. One of the main tasks is the modernization of coke pusher No. 4, a machine responsible for delivering finished coke from the chambers to special [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/kametstal-is-upgrading-equipment-at-coke-oven-battery-no-5/" data-wpel-link="internal">Kametstal is upgrading equipment at coke oven battery No. 5</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Central Mining updates conveyor gearboxes at crushing plant]]></title>
		<link>https://gmk.center/en/news/central-mining-updates-conveyor-gearboxes-at-crushing-plant/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Thu, 18 Sep 2025 03:13:37 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[Central GOK]]></category>
		<category><![CDATA[capital investment]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=113446</guid>

					<description><![CDATA[<p>The Central Mining and Processing Plant (Central Mining) is continuing its program to modernize the drive gearboxes of its conveyors. The main goal is to replace components that have reached the end of their service life with modern and more reliable equivalents. This will prevent emergency shutdowns, maintain a stable production rhythm, and ensure personnel [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/central-mining-updates-conveyor-gearboxes-at-crushing-plant/" data-wpel-link="internal">Central Mining updates conveyor gearboxes at crushing plant</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[ArcelorMittal Poland to build first solar power plant in Silesia]]></title>
		<link>https://gmk.center/en/news/arcelormittal-poland-to-build-first-solar-power-plant-in-silesia/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 10 Sep 2025 10:44:33 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[ArcelorMittal]]></category>
		<category><![CDATA[decarbonization]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=113185</guid>

					<description><![CDATA[<p>Polish steel producer ArcelorMittal Poland has announced the construction of a solar power plant on the territory of its division in Świętochłowice, formerly known as Huta Florian. It will be the first photovoltaic farm in the company’s history, which will provide electricity to local production facilities, according to a press release. The project envisages the [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/arcelormittal-poland-to-build-first-solar-power-plant-in-silesia/" data-wpel-link="internal">ArcelorMittal Poland to build first solar power plant in Silesia</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Metinvest launches gas generators at Northern Mining to achieve energy independence]]></title>
		<link>https://gmk.center/en/news/metinvest-launches-gas-generators-at-northern-mining-to-achieve-energy-independence/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 10 Sep 2025 09:21:10 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Metinvest]]></category>
		<category><![CDATA[energy]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=113174</guid>

					<description><![CDATA[<p>As part of a program to ensure the energy independence of Metinvest Group companies, two gas generators have been operating at the Northern Mining and Processing Plant (Northern Mining) since July. In two months of operation, they have generated 1,040 MWh of electricity and achieved economic benefits of UAH 2.3 million. In total, four such [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/metinvest-launches-gas-generators-at-northern-mining-to-achieve-energy-independence/" data-wpel-link="internal">Metinvest launches gas generators at Northern Mining to achieve energy independence</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Capital investments in Ukraine&#8217;s steel industry grew to UAH 7.99 billion in 1H2025]]></title>
		<link>https://gmk.center/en/news/capital-investments-in-ukraine-s-steel-industry-grew-to-uah-7-99-billion-in-1h2025/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Mon, 01 Sep 2025 10:36:46 +0000</pubDate>
				<category><![CDATA[Industry]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=112810</guid>

					<description><![CDATA[<p>Capital investments in the sector “Steel production, production of finished steel products, except for machinery and equipment” in January-June 2025 increased by 57.9% compared to the same period in 2024, reaching UAH 7.99 billion. This is evidenced by data from the State Statistics Service. Capital investments in the “Mining and quarrying” sector amounted to UAH [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/capital-investments-in-ukraine-s-steel-industry-grew-to-uah-7-99-billion-in-1h2025/" data-wpel-link="internal">Capital investments in Ukraine&#8217;s steel industry grew to UAH 7.99 billion in 1H2025</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Zaporizhstal invests UAH 135 million in overhaul of heating wells]]></title>
		<link>https://gmk.center/en/news/zaporizhstal-invests-uah-135-million-in-overhaul-of-heating-wells/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 27 Aug 2025 11:23:00 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Zaporizhstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=112660</guid>

					<description><![CDATA[<p>As part of its annual capital investment program, Metinvest Group’s Zaporizhstal steelworks is carrying out comprehensive overhaul of three groups of heating wells in the slab department of the hot rolling mill. The total cost of the work exceeds UAH 135 million, according to a press release. According to the acting CEO of the plant, [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/zaporizhstal-invests-uah-135-million-in-overhaul-of-heating-wells/" data-wpel-link="internal">Zaporizhstal invests UAH 135 million in overhaul of heating wells</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Metinvest resumes construction of thickening complex at Northern Mining]]></title>
		<link>https://gmk.center/en/news/metinvest-resumes-construction-of-thickening-complex-at-northern-mining/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Fri, 08 Aug 2025 05:24:26 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Northern GOK]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=112409</guid>

					<description><![CDATA[<p>The construction of a state-of-the-art thickening complex for beneficiation waste is underway at Northern Mining and Processing Plant (Northern Mining, Metinvest Group). The facility is located on the territory of the process water and sludge management shop. It will allow the company to reduce costs, cut energy consumption, reduce water consumption and reduce the environmental [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/metinvest-resumes-construction-of-thickening-complex-at-northern-mining/" data-wpel-link="internal">Metinvest resumes construction of thickening complex at Northern Mining</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Poland&#8217;s JSW launches €25.6 million project to produce hydrogen from methane]]></title>
		<link>https://gmk.center/en/news/poland-s-jsw-launches-e25-6-million-project-to-produce-hydrogen-from-methane/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Thu, 24 Jul 2025 08:03:34 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[decarbonization]]></category>
		<category><![CDATA[Poland]]></category>
		<category><![CDATA[Jastrzebska Spolka Weglowa]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=111777</guid>

					<description><![CDATA[<p>Jastrzębska Spółka Węglowa (JSW), Europe’s largest producer of coking coal, has officially launched the ambitious METH2GEN project, which aims to combat mine methane and use it to produce cheap hydrogen. The total budget for the initiative is €25.6 million, of which more than €20 million is being financed by the company itself. The project has [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/poland-s-jsw-launches-e25-6-million-project-to-produce-hydrogen-from-methane/" data-wpel-link="internal">Poland&#8217;s JSW launches €25.6 million project to produce hydrogen from methane</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[ArcelorMittal Kryvyi Rih has acquired four new SHAHTUI mining dump trucks]]></title>
		<link>https://gmk.center/en/news/arcelormittal-kryvyi-rih-has-acquired-four-new-shahtui-mining-dump-trucks/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Tue, 22 Jul 2025 07:51:14 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=111670</guid>

					<description><![CDATA[<p>ArcelorMittal Kryvyi Rih’s motor transport department has added four new SHAHTUISK90-C6 dump trucks with a load capacity of 60 tons to its fleet of heavy-duty vehicles. The company is one of the first in Ukraine to introduce this model into production. This was reported in the corporate newspaper Metallurg. The new machines are already operating [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/arcelormittal-kryvyi-rih-has-acquired-four-new-shahtui-mining-dump-trucks/" data-wpel-link="internal">ArcelorMittal Kryvyi Rih has acquired four new SHAHTUI mining dump trucks</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Metinvest has attracted €24 million in foreign capital to modernize Northern Mining]]></title>
		<link>https://gmk.center/en/news/metinvest-has-attracted-e24-million-in-foreign-capital-to-modernize-northern-mining/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Mon, 21 Jul 2025 11:17:20 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Metinvest]]></category>
		<category><![CDATA[modernization]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=111650</guid>

					<description><![CDATA[<p>Metinvest Group announced that it had secured a €23.6 million buyer credit facility with a term of 11.5 years for the Northern Mining and Processing Plant in Kryvyi Rih. The loan was provided under the guarantee of the Finnish export credit agency Finnvera. Deutsche Bank acted as the sole arranger and lender, with legal support [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/metinvest-has-attracted-e24-million-in-foreign-capital-to-modernize-northern-mining/" data-wpel-link="internal">Metinvest has attracted €24 million in foreign capital to modernize Northern Mining</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Interpipe to invest $120 million in modernizing railway product manufacturing by 2032]]></title>
		<link>https://gmk.center/en/news/interpipe-to-invest-120-million-in-modernizing-railway-product-manufacturing-by-2032/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Wed, 16 Jul 2025 09:42:22 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[Interpipe]]></category>
		<category><![CDATA[railway products]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[capital investment]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=111451</guid>

					<description><![CDATA[<p>Ukrainian industrial company Interpipe plans to invest $120 million in modernizing its railway product manufacturing facilities by 2032. The company presented the investment program at the Ukraine Recovery Conference 2025 international conference held in Rome, according to a press release. The program includes several key projects: the construction of a new heat treatment line, the [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/interpipe-to-invest-120-million-in-modernizing-railway-product-manufacturing-by-2032/" data-wpel-link="internal">Interpipe to invest $120 million in modernizing railway product manufacturing by 2032</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Polish Walcownia Blach Batory invests in wear-resistant steel production]]></title>
		<link>https://gmk.center/en/news/polish-walcownia-blach-batory-invests-in-wear-resistant-steel-production/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Tue, 15 Jul 2025 07:51:12 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[steel production]]></category>
		<category><![CDATA[Poland]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=111392</guid>

					<description><![CDATA[<p>Walcownia Blach Batory (WBB), part of the Węglokoks group (Poland), has launched an investment project entitled “Production of high-hardness wear-resistant steel directly on the rolling mill.” The initiative is financed by the Polish Reprivatization Fund, according to a press release from the company. On July 1, the company held negotiations with INOXIHP Poland regarding the [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/polish-walcownia-blach-batory-invests-in-wear-resistant-steel-production/" data-wpel-link="internal">Polish Walcownia Blach Batory invests in wear-resistant steel production</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Zaporizhcoke completes overhaul of coke oven battery No. 2]]></title>
		<link>https://gmk.center/en/news/zaporizhcoke-completes-overhaul-of-coke-oven-battery-no-2/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Fri, 11 Jul 2025 11:37:49 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Ukraine’s iron and steel industry]]></category>
		<category><![CDATA[Zaporizhcoke]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=111306</guid>

					<description><![CDATA[<p>Zaporizhcoke, a subsidiary of Metinvest Group, has completed the next stage of its overhaul program for coke oven battery No. 2. In 2025, the company allocated approximately UAH 50 million to modernize the production unit. The repairs not only extended the battery’s service life, but also stabilized production indicators and reduced the impact on the [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/zaporizhcoke-completes-overhaul-of-coke-oven-battery-no-2/" data-wpel-link="internal">Zaporizhcoke completes overhaul of coke oven battery No. 2</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Thyssenkrupp launches new production lines in Duisburg with €800 million investment]]></title>
		<link>https://gmk.center/en/news/thyssenkrupp-launches-new-production-lines-in-duisburg-with-e800-million-investment/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Mon, 07 Jul 2025 08:12:19 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Germany]]></category>
		<category><![CDATA[Thyssenkrupp]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=111031</guid>

					<description><![CDATA[<p>Steel company thyssenkrupp Steel Europe has completed a major upgrade of its production complex in Duisburg, Germany. After two years of construction and installation, the company has launched a new continuous casting machine (CCM) No. 4, a deeply modernized hot rolling mill No. 4 with two walking beam furnaces, and fully automated slab logistics. This [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/thyssenkrupp-launches-new-production-lines-in-duisburg-with-e800-million-investment/" data-wpel-link="internal">Thyssenkrupp launches new production lines in Duisburg with €800 million investment</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title><![CDATA[Overhaul of key boiler unit No. 9 has begun at Kametstal&#8217;s thermal power plant]]></title>
		<link>https://gmk.center/en/news/overhaul-of-key-boiler-unit-no-9-has-begun-at-kametstal-s-thermal-power-plant/</link>
		
		<dc:creator><![CDATA[Masha Malonog]]></dc:creator>
		<pubDate>Sun, 06 Jul 2025 05:57:31 +0000</pubDate>
				<category><![CDATA[Companies]]></category>
		<category><![CDATA[capital investment]]></category>
		<category><![CDATA[Kametstal]]></category>
		<guid isPermaLink="false">https://gmk.center/?post_type=news&#038;p=110997</guid>

					<description><![CDATA[<p>In the boiler room of the Kametstal steel plant’s thermal power plant, major repairs have begun on the most powerful medium-pressure boiler unit No. 9. This unit plays a critical role in meeting the plant’s technological needs, producing steam for turbo blowers and key production units. This is stated in the company’s press release. A [&#8230;]</p>
<p>The post <a href="https://gmk.center/en/news/overhaul-of-key-boiler-unit-no-9-has-begun-at-kametstal-s-thermal-power-plant/" data-wpel-link="internal">Overhaul of key boiler unit No. 9 has begun at Kametstal&#8217;s thermal power plant</a> appeared first on <a href="https://gmk.center/en" data-wpel-link="internal">GMK</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
